Design management

Design management: reviews, specifications, quality assurance, quality control and value engineering

Design gets done on time when someone owns the stages, the reviews and the open items. We manage design for owners, contractors and consultants.

Stage 2Stage 3Stage 4QAQCplanschecksQuality loop
VendorLoc illustration

The problem we solve

Design problems rarely come from one big mistake. They come from stage gates that nobody defined, review comments that never close, specifications that conflict with drawings, and value engineering that arrives after the design is frozen.

On Saudi projects the design team may follow RIBA stages, AIA phases or the employer's own stage names. Without a mapping, everyone says 'design development' and means something different.

What we deliver

  • Design stage plan: deliverables per stage, mapped between RIBA and AIA vocabulary and the employer's stages
  • Design programme and responsibility matrix
  • Design review cycles with a comments register and closure tracking
  • Specification writing and reviews, aligned with drawings and the BOQ
  • Quality assurance (QA): design quality plan, procedures, ITP approval and audits, set up before the work starts
  • Quality control (QC): checking the design work through inspections, review and hold points, tests and non-conformance reports (NCRs)
  • Value engineering workshops and option reports, with cost and programme impact described
  • Code-compliance reviews against the codes the project names
  • Design change control and close-out
Two people reading drawings together
Illustrative image, not a client project.
Rapid BIM render of a connection detail
Illustrative image, not a client project.
Aerial view of a large construction site with several cranes
Illustrative image, not a client project.

How we work

  1. Set the stages

    Agree names, deliverables and sign-off for each stage at the start.

  2. Run reviews

    Scheduled reviews with a single register of comments, owners and due dates.

  3. Control specifications

    One specification set, checked against drawings and the BOQ.

  4. Assure, then control

    QA sets the quality plan, procedures and audits before design work starts. QC then checks each deliverable at review, hold and witness points and records NCRs.

  5. Test options

    Value engineering is run when it can still change the design, with the cost and programme effect shown.

  6. Close out

    Comments closed, changes logged, and the design record handed over.

Frequently asked questions

Do you design the building?

No. We manage and review design. The designer of record stays responsible for the design and the stamped drawings.

Which codes do you check against?

The ones the project names. We do not assume an edition; the employer's requirements or the authority's instructions decide which codes and versions apply.

Can you run value engineering on a design that is already approved?

Yes, but change is costlier late. We show the saving, the redesign effort and the programme effect before anyone decides.

Do you work with RIBA or AIA?

Both. We use the RIBA Plan of Work 2020 and the AIA phases as a shared vocabulary and map them to your stages.

Talk to us about this service

Tell us the project stage, the design team structure and what is holding the design up.